Newland Marsh Restoration Permitting and Design

Location: Orange County

Project Type: Restoration, Restoration Planning

Status: Current

Habitat Type: Tidal Wetland

Cost: $450,000

Funding Gap: $350,000

Project Footprint: 44.8 acres

Project Footprint: .5 stream miles

Assembly District: 74

Senate District: 37

Congressional District: 48

Project Lead/Grantee:
Huntington Beach Wetlands Conservancy (John Villa, John@hbwetlands.org)

The Huntington Beach Wetlands Conservancy will prepare 60% and final restoration design plans, complete necessary studies for permitting, and secure permits for restoration at Newland Marsh, a 44.8-acre tidal wetland. The Project will create a culvert connection to the HB Channel to convey muted tides and sea water through the marsh, create a tidal channel network to distribute water throughout the marsh, and install flood protection berms along the perimeter of the marsh, which will be planted with salt marsh vegetation.