Top of Page

 


View the 2017 WRP Work Plan here.

View Potential Project Feasibility Criteria here.

View the Pre-proposal Template here.


The Wetlands Recovery Project Work Plan contains proposed preservation/ acquisition, restoration, and enhancement projects that will further the goals identified in the Regional Strategy. Projects are evaluated per ecological, policy, and feasibility criteria that are based on regional goals, and are vetted by the 18 member agencies that comprise the Wetland Managers group.

Subsequent to this vetting process, the Work Plan is adopted by the Board of Governors at their annual meeting. The adopted Work Plan is a valuable tool for communicating regional priorities and funding needs, and for facilitating WRP partner agency collaboration. However, being on the Work Plan does not necessarily guarantee project funding.

The Work Plan is periodically updated through a Request for Proposals process. While an RFP for the Work Plan is only released every few years, project proposals can be submitted at any time and will be reviewed by the Wetland Managers Group. Although an RFP is not currently circulating, you may be eligible for an out-of-cycle addition. If you have a project that you want to have considered for an out-of-cycle Work Plan addition and you believe meets the Work Plan project requirements and, importantly, has critical timing associated with it, please contact WRP staff.

 

Check out the Project Board below to see our current Work Plan projects!

Work Plan Project Board

Topanga Lagoon Restoration and Facilities Management Plan

Planning

Cost: $500,000

Type: Fish Passage and Riparian

Trancas Creek Lagoon Restoration Planning Project

Planning

Cost: $1,300,000

Type: Coastal wetlands

San Jose Creek Fish Passage Improvements – Dos Arroyos Ranch

Restoration

Cost: $115,000

Type: fish passage

Assembly District: 37

Senate District: 19

Congressional District: 24

Santa Ana River, Featherly Regional Park Restoration

Restoration

Cost: $492,600

Assembly District: 55

Senate District: 29

Congressional District: 39

Santa Margarita River Fish Passage Project

Restoration

Cost: $605,395

Assembly District: 75

Senate District: 38

Congressional District: 50

Newland Marsh Acquisition

Acquisition

Cost: Confidential

Assembly District: 67

Senate District: 35

Congressional District: 46

San Jose Fish Passage Project

Restoration

Cost: $1,916,804

Assembly District: 37

Senate District: 19

Congressional District: 24

Goat Canyon Enhancement Project

Restoration

Cost: $8,405,700

Type: Riparian

Assembly District: 80

Senate District: 40

Congressional District: 51

Goat Canyon Enhancement Project, Final Design Plans

Planning

Cost: $1,344,800

Type: Riparian

Assembly District: 80

Senate District: 40

Congressional District: 51

Tijuana Estuary Tidal Restoration Program Phase II

Restoration

Cost: $1,232,316

Type: tidal wetlands

Assembly District: 78

Senate District: 40

Congressional District: 51

Tijuana Model Marsh Restoration

Restoration

Type: tidal wetlands

Assembly District: 78

Senate District: 40

Congressional District: 51

Tijuana River Valley Invasive Plant Control Program

Enhancement

Cost: $500,000

Type: Exotics Control, tidal wetlands

Assembly District: 80

Senate District: 40

Congressional District: 51

Fenton Properties Acquisition

Acquisition

Cost: $3,000,000

Type: Riparian

Assembly District: 80

Senate District: 40

Congressional District: 51

South San Diego Bay Coastal Wetland Restoration Project

Restoration

Type: tidal wetlands

Assembly District: 80

Senate District: 40

Congressional District: 53

Famosa Slough Culvert Replacement

Restoration

Cost: $181,000

Type: tidal wetlands

Assembly District: 78

Senate District: 39

Congressional District: 52

Famosa Slough Culvert Extension and Retrofit Design

Planning

Cost: $82,500

Type: tidal wetlands

Assembly District: 78

Senate District: 39

Congressional District: 52

San Diego River Land Conservation Program: Hanlon-Walker Acquisition

Acquisition

Cost: $2,144,500

Type: Riparian

Assembly District: 71

Senate District: 38

Congressional District: 50

Hanson Pond Acquisition, El Monte Valley

Acquisition

Cost: $5,000,000

Type: tidal wetlands

Assembly District: 71

Senate District: 38

Congressional District: 52

Los Penasquitos – Sediment Management

Restoration

Cost: $2,516,000

Type: sedimentation, Tidal Wetland

Assembly District: 78

Senate District: 39

Los Penasquitos Hydrology Study

Planning

Cost: $250,000

Type: sedimentation, Tidal Wetland

Assembly District: 78

Senate District: 39

Congressional District: 49

San Dieguito Lagoon Wetland Acquisition

Acquisition

Cost: $4,253,000

Type: tidal wetlands

Assembly District: 78

Senate District: 39

Congressional District: 49

San Elijo Lagoon Acquisition Program

Acquisition

Cost: $3,717,000

Type: tidal wetlands

Assembly District: 78

Senate District: 39

Congressional District: 49

San Elijo Lagoon Preliminary Sediment Quality Assessment

Planning

Cost: $133,882

Type: tidal wetlands

Assembly District: 76

Senate District: 36

Congressional District: 49

Escondido Creek Watershed Restoration Action Strategy

Planning

Cost: $328,000

Type: tidal wetlands

Assembly District: 76

Senate District: 36

Congressional District: 49

San Elijo Lagoon Exotics Removal

Enhancement

Cost: $73,000

Type: Exotics Control, tidal wetlands

Assembly District: 78

Senate District: 39

Congressional District: 49

San Elijo Lagoon Non-native Plant Management

Enhancement

Cost: $293,207

Type: Exotics Control, tidal wetlands

Assembly District: 76

Senate District: 36

Congressional District: 49

San Elijo Lagoon Tidal Flushing Project

Restoration

Cost: $2,300,000

Type: tidal wetlands

Assembly District: 76

Senate District: 36

Congressional District: 49

Carlsbad Hydrologic Unit Riparian Habitat Restoration

Restoration

Cost: $5,460,000

Type: Exotics Control, Riparian

Assembly District: 76

Senate District: 36

Congressional District: 49

Batiquitos Lagoon Mitsuuchi Acquisition

Acquisition

Cost: $2,400,000

Type: tidal welands

Assembly District: 76

Senate District: 36

Congressional District: 49

Agua Hedionda Caulerpa Taxifolia Eradication Program

Enhancement

Cost: $6,000,000

Type: Exotics Control

Assembly District: 76

Senate District: 38

Congressional District: 49

Buena Vista Creek Watershed Plan

Planning

Cost: $374,500

Type: Riparian

Assembly District: 76

Senate District: 36

Congressional District: 49

Buena Vista Creek Acquisition, Sherman Parcel

Acquisition

Cost: $9,500,000

Type: Riparian

Assembly District: 76

Senate District: 36

Congressional District: 49

Buena Vista Lagoon Restoration Plan, Feasibility Analysis

Planning

Cost: $688,000

Type: tidal wetlands

Assembly District: 76

Senate District: 36

Congressional District: 49

San Luis Rey River Arundo Removal

Enhancement

Cost: $8,403,500

Type: Exotics Control

Assembly District: 76

Senate District: 36

Congressional District: 49

Upper Sulphur Creek Restoration Project

Restoration

Cost: $287,200

Type: Exotics Control, tidal wetlands

Assembly District: 73

Senate District: 36

Congressional District: 48

San Juan Hydrologic Unit – Non-native Species Eradication Plan

Planning

Cost: $235,000

Type: Exotics Control

Assembly District: 73

Senate District: 36

Upper Newport Bay Ecological Restoration, Final Design

Planning

Cost: $53,300,000

Type: tidal wetlands

Assembly District: 74

Senate District: 37

Congressional District: 48

Upper Newport Bay Ecological Restoration Implementation

Restoration

Cost: $53,300,000

Type: Tidal Wetland

Assembly District: 74

Senate District: 37

Congressional District: 48

San Joaquin Marsh Enhancement – Phase I

Enhancement

Cost: $2,492,900

Type: Tidal Wetland

Assembly District: 74

Senate District: 37

Congressional District: 45

Big Canyon Creek Restoration Plan

Planning

Cost: $429,000

Type: Riparian

Assembly District: 74

Senate District: 37

Congressional District: 48

Huntington Beach Wetlands Acquisitions (3)

Acquisition

Cost: $3,503,066

Type: tidal wetlands

Assembly District: 74

Senate District: 37

Congressional District: 48

Huntington Beach Wetlands Restoration Plan

Planning

Cost: $350,000

Type: tidal wetlands

Assembly District: 74

Senate District: 37

Congressional District: 48

East Garden Grove Wintersburg Channel Treatment

Planning

Cost: $175,000

Type: tidal wetlands

Assembly District: 72

Senate District: 34

Congressional District: 48

Bolsa Chica Wetlands Restoration

Restoration

Cost: $144,000,000

Type: tidal wetlands

Assembly District: 74

Senate District: 34

Congressional District: 48

Los Cerritos Wetlands Complex – Bryant Acquisition

Acquisition

Cost: $14,000,000

Type: tidal wetlands

Assembly District: 70

Senate District: 34

Congressional District: 38

Colorado Lagoon Restoration Planning Project

Planning

Cost: $400,000

Type: tidal wetlands

Assembly District: 70

Senate District: 34

Congressional District: 47

Machado Lake Habitat Restoration Project

Planning

Cost: $300,000

Assembly District: 55

Senate District: 27

Congressional District: 33

El Dorado Wetlands Restoration Plan

Planning

Cost: $100,000

Type: Tidal Wetland

Assembly District: 55

Senate District: 14

Congressional District: 47

DeForest-Dominguez Wetlands Restoration: Planning and Design

Planning

Cost: $150,000

Type: Riparian, Tidal Wetland

Assembly District: 55

Senate District: 25

Congressional District: 47

Coyote Creek Watershed Plan

EnhancementPlanning

Cost: $3,400,000

Assembly District: 70

Senate District: 34

Congressional District: 47

Hazard Park Wetlands Restoration Concept Plan

Planning

Cost: $6,000,000

Type: Riparian

Assembly District: 45

Senate District: 24

Congressional District: 34

Ballona Wetlands Acquisition

Acquisition

Cost: $140,000,000

Type: Tidal Wetland

Assembly District: 62

Senate District: 26

Congressional District: 33

Topanga Creek Restoration Program

Restoration

Type: Riparian

Assembly District: 50

Senate District: 27

Topanga Lagoon Restoration Technical Assessments

Planning

Type: Tidal Wetland

Assembly District: 50

Senate District: 27

Congressional District: 33

Topanga Lagoon and Watershed Restoration Feasibility Study

Planning

Cost: $500,000

Type: Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Upper Zuniga Road Acquisitions

Acquisition

Type: Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Tuna Canyon SEA Acquisition

Acquisition

Type: Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Cold Creek Riparian Acquisitions: Part 1

Acquisition

Cost: $1,950,000

Type: Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Cross Creek Road Fish Passage

Restoration

Cost: $590,000

Type: fish passage, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Las Flores Creek Restoration

Restoration

Cost: $2,800,000

Type: Exotics Control, Riparian, sedimentation

Assembly District: 41

Senate District: 23

Congressional District: 33

Malibu Lagoon Restoration and Enhancement

Restoration

Cost: $6,596,695

Type: Tidal Wetland

Assembly District: 50

Senate District: 27

Congressional District: 33

Malibu Lagoon Restoration and Enhancement Phase I

Restoration

Cost: $1,925,000

Type: Tidal Wetland

Assembly District: 50

Senate District: 27

Congressional District: 33

Malibu Creek Arundo Removal Project

Restoration

Cost: $358,400

Type: Exotics Control, Riparian

Assembly District: 55

Senate District: 27

Congressional District: 33

Santa Monica Bay Watershed Acquisitions

Acquisition

Cost: $17,200,000

Type: Riparian

Assembly District: 50

Senate District: 27

Zuma Canyon Restoration and Steelhead Enhancement Feasibility Study

Planning

Cost: $401,612

Type: Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Solstice Creek Steelhead Access Implementation

Restoration

Type: fish passage, Riparian

Assembly District: 50

Senate District: 27

Solstice Canyon Acquisition II

Acquisition

Type: fish passage, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

La Sierra Riparian Acquisition

Acquisition

Cost: $7,755,000

Type: Riparian, Tidal Wetland

Assembly District: 50

Senate District: 27

Congressional District: 33

Solstice Creek Steelhead Enhancement Design Plans

Planning

Cost: $200,000

Type: fish passage, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Grimes Canyon Stream Restoration Project

Restoration

Cost: $931,400

Type: erosion, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 26

Ormond Beach Edison Acquisition

Acquisition

Cost: $10,638,000

Type: Tidal Wetland

Assembly District: 44

Senate District: 19

Congressional District: 26

Hedrick Ranch Nature Area Restoration Project

Restoration

Cost: $500,000

Type: Riparian

Assembly District: 37

Senate District: 19

Congressional District: 26

Ventura River Arundo Removal Project

Restoration

Cost: $355,700

Type: Exotics Control, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 26

Matilija Dam Evaluation Project

Planning

Cost: $615,000

Type: fish passage, sedimentation

Assembly District: 37

Senate District: 19

Congressional District: 26

Matilija Dam Removal Feasibility Study

Planning

Cost: $5,150,000

Type: fish passage, sedimentation

Assembly District: 37

Senate District: 19

Congressional District: 26

Prisoners Wetland and Lower Canada del Puerto Restoration

Restoration

Cost: $775,069

Type: Riparian, Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Carpinteria Creek Arundo Removal Project

Restoration

Cost: $197,430

Type: exotic control, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Carpinteria Salt Marsh, Basin 1 Implementation

Restoration

Cost: $2,663,300

Type: Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Carpinteria Salt Marsh, Basin 1 Enhancement Plan

Planning

Cost: $100,000

Type: Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Mission Creek Steelhead Passage Project

Planning

Cost: $1,394,000

Type: fish passage, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Mission Creek Museum Area Restoration Plan

Planning

Cost: $148,000

Type: exotic control, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Santa Barbara Urban Streams and Wetlands Restoration

Planning

Cost: $322,000

Type: Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Summerland/Greenwell Preserve Restoration

Restoration

Cost: $100,000

Type: Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Arroyo Burro Estuary and Mesa Creek Restoration

Restoration

Cost: $1,089,000

Type: Public Access, Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Western Goleta Slough Wetland Restoration Project

Restoration

Cost: $1,799,250

Type: Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Goleta Slough Tidal Restoration Demonstration Project

Planning

Cost: $500,000

Type: Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Goleta Slough Tidal Restoration Study

Planning

Cost: $308,000

Type: Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

UCSB Campus Lagoon Enhancement Planning

Planning

Cost: $232,870

Type: Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Devereux Slough/Ellwood Mesa Regional Plan

Planning

Cost: $160,000

Assembly District: 37

Senate District: 19

Congressional District: 24

Lower Refugio Creek Restoration

Restoration

Cost: $157,000

Assembly District: 37

Senate District: 19

Congressional District: 24

Arroyo Hondo Ranch Acquisition

Acquisition

Cost: $6,176,000

Assembly District: 37

Senate District: 19

Congressional District: 24

MacHutchin Property Acquisition at Buena Vista Lagoon

Acquisition

Cost: $1,600,000

Type: Acquisition, coastal wetland

Assembly District: 76

Senate District: 36

Congressional District: 49

Arroyo Hondo Creek Steelhead Passage Enhancement

Restoration

Cost: $1,465,588

Type: fish passage, Restoration, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Solstice Creek Habitat Restoration

Restoration

Cost: $102,806

Type: Restoration

Assembly District: 50

Senate District: 27

South San Diego Bay Restoration

Restoration

Cost: $5,631,666

Type: Restoration

Assembly District: 78, 80

Senate District: 39, 40

Bolsa Chica Lowlands Restoration

Restoration

Cost: $144,000,000

Type: Restoration, Tidal Wetland

Assembly District: 74

Senate District: 34

Congressional District: 48

Serrano Creek Stabilization and Restoration

Planning

Cost: $2,000,000

Type: Enhancement, Planning

Assembly District: 70

Senate District: 35

Congressional District: 45

Cottonwood Creek Park Riparian Restoration

Restoration

Cost: $272,500

Type: Riparian, Water Quality

Assembly District: 74

Senate District: 38

Congressional District: 49

Colorado Lagoon Restoration

Restoration

Cost: $8,725,800

Type: Public Access/Recreation, Tidal Wetland, Water Quality

Assembly District: 70

Senate District: 34

Congressional District: 47

Devereux Slough: Ocean Meadows Acquisition

Acquisition

Cost: $4,600,000

Type: fish passage, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Devereux Slough Ocean Meadows Restoration

Planning

Cost: $1,143,000

Type: coastal wetland

Assembly District: 37

Senate District: 19

Upper Newport Bay Eelgrass Restoration Project

Restoration

Cost: $156,000

Type: coastal wetland

Assembly District: 74

Senate District: 37

Alamitos Bay Oyster Restoration Project

Restoration

Cost: $89,100.00

Type: estuarine

Assembly District: 70

Senate District: 37

Deforest Wetlands Restoration

Construction

Cost: $6,791,482

Type: Riparian, wetland

Assembly District: 64

Senate District: 33

Upper Malibu Creek Feasibility Study (Rindge Dam)

Planning

Cost: $3,900,000

Type: fish passage

Assembly District: 41

Senate District: 27

Ventura River Parkway

Acquisition

Cost: $8,000,000

Type: Erosion/Sedimentation, Exotics Control, Interpretive/Education, Public Access/Recreation, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 26

Trabuco Creek Fish Passage Project

Planning

Cost: $1,875,000

Type: fish passage

Assembly District: 73

Senate District: 36

Congressional District: 49

Topanga Creek and Lagoon Restoration Program

Restoration

Cost: $4,216,000

Type: Erosion/Sedimentation, Exotics Control, fish passage, Freshwater Wetland, Interpretive/Education, Public Access/Recreation, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Tijuana Estuary Tidal Restoration Program

Planning

Cost: $1,095,000

Type: Freshwater Wetland, Riparian, Tidal Wetland

Assembly District: 78

Senate District: 40

Congressional District: 51

Stewart Canyon Creek

Restoration

Cost: $588,000

Type: Exotics Control, fish passage, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Solstice Canyon Acquisition

Acquisition

Cost: $9,050,800

Type: Public Access/Recreation, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Serrano Creek Stabilization & Restoration Phase II: Reach 2 & 3

Planning

Cost: $1,500,000

Type: Exotics Control, Riparian

Assembly District: 70

Senate District: 35

Congressional District: 48

Sepulveda Basin Plan

Planning

Cost: $485,000

Type: Freshwater Wetland, Interpretive/Education, Water Quality

Assembly District: 45

Senate District: 27

Congressional District: 30

Santiago Creek Arundo Control and Habitat Restoration

Restoration

Cost: $2,391,000

Type: Exotics Control, Riparian

Assembly District: 55

Senate District: 29

Congressional District: 39

Santa Clara River Parkway Acquisitions

Acquisition

Cost: $14,669,411

Type: Erosion/Sedimentation, fish passage, Public Access/Recreation, Riparian

Assembly District: 37, 44

Senate District: 19, 27

Congressional District: 24, 26

Santa Clara River Estuary McGrath State Beach

Restoration

Cost: $204,900

Type: Erosion/Sedimentation, Exotics Control, fish passage, Freshwater Wetland, Riparian, Tidal Wetland

Assembly District: 44

Senate District: 19

Congressional District: 26

San Juan and Trabuco Creek Watershed Steelhead Recovery Project

Restoration

Cost: $25,000,000

Type: Exotics Control, fish passage, Riparian, Tidal Wetland

Assembly District: 73

Senate District: 36

Congressional District: 49

San Joaquin Marsh Enhancement – Phase II Implementation

Restoration

Cost: $3,700,000

Type: Freshwater Wetland, Riparian

Assembly District: 74

Senate District: 37

Congressional District: 45

Rio Honda/Upper San Gabriel River Watershed Arundo Eradication Program

Restoration

Cost: $978,000

Type: Exotics Control, Riparian

Assembly District: 49

Senate District: 22

Congressional District: 38, 39

San Elijo Lagoon Restoration Planning and Engineering

Planning

Cost: $80,000,000

Type: Erosion/Sedimentation, Tidal Wetland

Assembly District: 76

Senate District: 36

Congressional District: 49

San Dieguito Watershed Invasive Species Control and Revegetation

Restoration

Cost: $4,766,000

Type: Erosion/Sedimentation, Exotics Control, Freshwater Wetland, Riparian, Tidal Wetland, Water Quality

Assembly District: 77

Senate District: 39

Congressional District: 52

San Diego River Watershed Riparian Restoration Program

Restoration

Cost: $5,000,000

Type: Exotics Control, Freshwater Wetland, Riparian, Tidal Wetland

Assembly District: 36

Senate District: 36

Congressional District: 50, 52

San Diego Canyon Wetlands Restoration Project

Planning

Cost: $348,000

Type: Freshwater Wetland, Riparian

Assembly District: 76

Senate District: 39

Congressional District: 51, 52, 53

Riparian Enhancement at Audubon Starr Ranch Sanctuary

Restoration

Cost: $245,000

Type: Exotics Control, Riparian

Assembly District: 73

Senate District: 33

Congressional District: 49

Rose Creek Watershed Opportunities Assessment

Restoration

Cost: $1,165,000

Type: Freshwater Wetland, Public Access/Recreation, Riparian

Assembly District: 79

Senate District: 39

Congressional District: 53

Ormond Beach Wetlands: Sod Farm Acquisition

Acquisition

Cost: $48,000,000

Type: Freshwater Wetland, Tidal Wetland

Assembly District: 37, 45

Senate District: 19, 28

Congressional District: 24, 27

Ormond Beach Wetlands Restoration Plan

Planning

Cost: 600,000

Type: Erosion/Sedimentation, Freshwater Wetland, Interpretive/Education, Public Access/Recreation, Tidal Wetland, Water Quality

Assembly District: 37, 46

Senate District: 19, 29

Congressional District: 24, 28

Orange Coast River Park

Planning

Cost: $51,500,000

Type: Exotics Control, Interpretive/Education, Public Access/Recreation, Riparian, Water Quality

Assembly District: 74

Senate District: 37

Congressional District: 48

Newport Valley Habitat Restoration

Restoration

Cost: $601,326

Type: Exotics Control, Freshwater Wetland, Interpretive/Education, Riparian

Assembly District: 70

Senate District: 35

Congressional District: 48

Mission Lagoon and Laguna Creek Restoration Project

Planning

Cost: $850,000

Type: Exotics Control, Freshwater Wetland, Riparian, Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Re-Wild Mission Bay Conceptual Plan

Planning

Cost: $485,000

Type: Tidal Wetland

Assembly District: 76

Senate District: 39

Congressional District: 52

Matilija Dam Ecosystem Restoration Program: Pre-Construction Removal Engineering and Design

Planning

Cost: $8,021,300

Type: fish passage, Riparian, Water Quality

Assembly District: 37

Senate District: 19

Congressional District: 24,26

Maria Ygnacio Aijian Barrier Removal

Restoration

Cost: $773,000

Type: Exotics Control, fish passage, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Malibu Creek Comprehensive Restoration

Restoration

Cost: $350,000

Type: Exotics Control, Interpretive/Education, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Los Cerritos Wetlands: Wetland Acquisition

Acquisition

Cost: Confidential

Type: Public Access/Recreation, Tidal Wetland

Assembly District: 72

Senate District: 34

Congressional District: 48

Los Cerritos Wetlands: Conceptual Restoration Plan

Planning

Cost: $500,000

Type: Exotics Control, Freshwater Wetland, Public Access/Recreation, Tidal Wetland, Water Quality

Assembly District: 72

Senate District: 34

Congressional District: 48

Los Angeles River Taylor Yard Acquisition

Acquisition

Cost: $25,000,000

Type: Interpretive/Education, Public Access/Recreation, Riparian, Water Quality

Assembly District: 51

Senate District: 24

Congressional District: 28

Gaviota State Park Watershed Restoration and Enhancement

Planning

Cost: $665,000

Type: Erosion/Sedimentation, Freshwater Wetland, Public Access/Recreation, Riparian, Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Famosa Slough Acquisition

Acquisition

Cost: Confidential

Type: Erosion/Sedimentation, Tidal Wetland, Water Quality

Assembly District: 78

Senate District: 39

Congressional District: 52

Devereux Slough Restoration

Restoration

Cost: $412,000

Type: Exotics Control, Freshwater Wetland, Tidal Wetland

Assembly District: 37

Senate District: 19

Congressional District: 24

Cold Creek Riparian Acquisitions: Part 2

Acquisition

Cost: $1,290,000

Type: Public Access/Recreation, Riparian

Assembly District: 50

Senate District: 27

Congressional District: 33

Carpinteria Creek Restoration Project

Restoration

Cost: $5,238,537

Type: fish passage, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Buena Vista Lagoon Restoration Plan: Preliminary Design, Engineering, and EIR

Planning

Cost: $1,700,000

Type: Erosion/Sedimentation, Public Access, Tidal Wetland, Water Quality

Assembly District: 76

Senate District: 36

Congressional District: 49

Batiquitos Lagoon Exotics Removal and Revegetation

Restoration

Cost: $350,000

Type: Exotics Control, Freshwater Wetland, Tidal Wetland

Assembly District: 76

Senate District: 36

Congressional District: 49

Ballona Wetlands Restoration Planning

Planning

Cost: $750,000

Type: Freshwater Wetland, Tidal Wetland

Assembly District: 53

Senate District: 28

Congressional District: 36

Atascadero and Maria Ygnacio Steelhead Restoration Design

Planning

Cost: $309,000 (Cristina Sandoval, 805-893-5092)

Type: fish passage, Riparian

Assembly District: 37

Senate District: 19

Congressional District: 24

Upper Los Angeles River Watershed Arundo Eradication Program

Restoration

Cost: $110,000

Type: Exotics Control, Riparian

Assembly District: 38

Senate District: 17

Congressional District: 27

Arroyo Burro Creek Restoration at Las Positas

Planning

Cost: $270,000

Type: Erosion/Sedimentation, Exotics Control, Riparian

Assembly District: 35

Senate District: 18

Congressional District: 24

Arroyo Burro Creek Arundo Removal Project

Restoration

Cost: $99,930

Type: Erosion/Sedimentation, Riparian

Assembly District: 35

Senate District: 19

Congressional District: 24

Aliso Creek Mainstem Riparian Restoration

Restoration

Cost: $45,000,000

Type: Erosion/Sedimentation, Exotics Control, Freshwater Wetland, Riparian, Water Quality

Assembly District: 74

Senate District: 37

Congressional District: 48

Aliso Creek Estuary Restoration

Planning

Cost: $300,000

Type: Freshwater Wetland, Interpretive/Education, Tidal Wetland

Assembly District: 70

Senate District: 33

Congressional District: 48