Sepulveda Basin Plan


Program: Planning

Status: Current

Project Type: Freshwater Wetland, Interpretive/Education, Water Quality

Cost: $485,000

Acres: 32

Stream Miles: 1

Assembly District: 45

Senate District: 27

Congressional District: 30

Project Lead/Grantee:
The River Project

OLYMPUS DIGITAL CAMERA 34.170340, -118.475044

Project Overview:

This project will undertake a cooperative planning effort for the rehabilitation of the Los Angeles River in the Sepulveda Basin, with the ultimate goal of utilizing bioengineered bank stabilization methods for streambank revegetation along nearly a mile of soft-bottom stream.

The project will include a detailed reach and site scale engineering and ecological analysis, a feasibility and design process that involves multiple agency involvement, and permitting.